IMG_0708_rosa

Raymond Rosa Parks Transportation Facility

Located in Downtown Detroit completed in ‘2011 was built for the state and controls the Traffic Signals throughout the city and region. This facility included custom curtain-walls, entrances and interior sliding heavy glass appointments. Glass is special Low-e to maintain a high level of energy efficiency.

UMLandmark

601 Forest (Landmark Properties)

14 story Student Housing, New Build

“EFCO” Curtain-walls, Storefronts, Entrances, “Wojan” 953 Hung windows, “PPG” Low-e Glass, “American” Swing Shower Enclosures. Mirror work at Interior. Project had multiple design and site issues for all trades, reduced run out schedule due to site problems on predecessor trades, Multiple Change orders, winter conditions, tight site spaces in Downtown Ann Arbor, Limited lift and elevator times, and many interface challenges with other scope substrates. End result….on time turnover, on budget, with minimal punch list. Owners were extremely happy and in turn we were invited to come back for subsequent projects on site even after the construction manager was competed.

wyndot

Wyandotte Court/Police Facility

Courthouse/Police Station – New Construction

“Tubelite” Curtain-wall, storefronts, Entrances, “PPG” Atlantica Solarcool and Low-e Glass, “Armortex” Bullet proof window systems, and specialty hardware products throughout. We were chosen from a short list to perform the work on this project. Work was performed in fall and winter near the Detroit river posing wind and weather challenges. Close coordination with our General Contractor was required to provide specific security measures for the new facility and to meet a short timeline requirement. The project was not only completed on time, but was noted by the city for its exceptional looks and functionality when done. This project earned us substantial future work with our customer and remains a beautiful landmark in Wyandotte.

flintStateoffice

Flint State Office Building

Office Building, Renovation

“EFCO” Front set storefronts, “Guardian” High Performance Low-e. Project was a fully occupied and operable State office building which posed specific challenges and required balance between productivity, tight timelines and the consideration of the occupants working within close quarters. This was a multiple story high rise and was renovated due to energy efficiency mandates and because of multiple leaks (Existing storefronts and glass were removed, brick work renovated and new high performance glass and frames were replaced). Special care was needed and close coordination with masons was required due to new flashings, insulation and weatherproofing required meeting new energy standards and insuring no leaks. End Result ……On time return to normal operations, perfect safety record, no leaks, Minimal punch list and high marks from the State of Michigan, the Architect and the site management of the contractor. A tough job well done….!!!!